Need Help? - Call: 0161 624 6211 or email: sales@owen-brothers.com

Cart:

0
You have no items in your shopping cart.

0

More Views

IP65 3 Phase - MID CT Operated Meter Kit A

Availability: In stock

£189.99

Quick Overview

SGS0130-Owen-Brothers-OB737Measuring Instruments Directive (MID 2004/22/EC)


Owen Brothers Metering can supply any DIN-Rail or Panel Mounted meter within our range in quality sealable metering panels also known as Meter Management Units or MMU’s that provide quick, easy and safe installation of CT operated devices.


Our metering panels include as standard DIN terminals for Current Transformer, Fuse (Including spare fuse within each carrier), Earth & Neutral disconnect with options such as Test Terminal Block (TTB) or CT shorting block assemblies for safe, accurate and legal installations.


 

Maximum number of characters: 150

* Required Fields

£189.99

Details

OB737CT-TK-IP65

Fully MID Approved Annex B & D - suitable for export of energy to the grid, industrial/commercial billing etc.

Three phase CT metering - 7 DIN modules, Standard DIN rail Format (DIN43880)

High Accuracy - IEC62053-21/22 Class 1.0,0.5S

● Import & Export active energy

● Import & Export reactive energy

● Instant Volt, Amp, Power factor, Frequency, Active power, Reactive power & Apparent power

Industrial control & AMR compatible

● Isolated pulse output and IR (DIN43864)

● RS485 communication port, Modbus Protocol

Large clear backlit display


Prewired kit including

1 x OB737CT MID certified multifunction meter

1 x IP65 Enclosure

3 x Fuse Carriers (Including spare fuse)

1 x Neutral (Disconnect)Terminal

1 x Earth Terminal

3 x Current Transformers

Metering board, 1 row, 14 modules, screwless PE/N terminal rails each with 3 screwable clamping points, 2.5 - 16 mm², 14 screwless clamping points, 1.5 - 4 mm², elastic entries on top, with cable covering, masking and labelling strips, additional double-membrane seals and other accessories  

300 x 300 x 142 mm


Additional Information

Model OB737CT-AK14
Manufacturer Owen Brothers
In Depth Electricity meters for Feed-In Tariffs (also known as FITs) are part of a Government backed scheme that pays people for generating their own "green electricity" (i.e. photovoltaic, wind, or hydro). The scheme is administered by Ofgem on behalf of the Department for Energy and Climate Change and further information is available from: http://www.ofgem.gov.uk/sustainability/environment/fits/Pages/fits.aspx To apply for the FIT scheme, installations must be in Great Britain and have a meter compliant with the metering legislation in place. This means that the electricity meter must be of an approved pattern or construction in accordance with Schedule 7 of the Electricity Act 1989. Prior to October 2006, only an approval issued under GB national legislation would satisfy this requirement and these meters are listed on the statutory list, known as Schedule 4. Visit the scehdule 4 section of the NMO website. From 30th October 2006, “approved” may also refer to an electricity meter type approved by a notified body under the European Measuring Instruments Directive (MID 2004/22/EC). NMO is responsible for designating notified bodies in the UK for the majority of the instruments covered by the Directive and SGS (UK) Ltd have been designated as a Notified Body for the conformity assessment of active electrical energy meters under Annex MI-003. Download MID approval certificates issued by SGS (UK) Ltd on the NMO website. MID approved meters are also required to carry the MID markings as required under the Directive. These consist of the CE marking, the MID marking which is made up of the letter ‘M’ and then the year of manufacture (for example a meter manufactured in 2011 would have the following MID marking ) and a four-digit code representing the Notified Body that approved and verified the meter. - See more at: http://www.bis.gov.uk/nmo/gas-and-electricity-meters/electricity-meters-introduction/Electricity-meters-for-feed-and-tariffs#sthash.WrAsI3ar.dpuf