OB737-CT 3 Phase CT Electric Meter. MID Certified.

OB737-CT 3 Phase CT Electric Meter. MID Certified.

OB737-CT 3 Phase CT Electric Meter. MID Certified.

OB737 series is a Polyphase Smart Energy Meter packed with all the features & functionality to cover the most demanding of projects. 

Fully MID Approved Annex B & D - suitable for renewable FIT/ROC export energy, industrial/commercial billing etc.

Three phase direct 100A metering - 7 DIN modules, Standard DIN rail Format (DIN43880)

High Accuracy - IEC62053-21/22 Class 1.0, 0.5S

● Import & Export active energy

● Import & Export reactive energy

● Instant Volt, Amp, Power factor, Frequency, Active power, Reactive power & Apparent power

Industrial control & AMR compatible

● Isolated pulse output and IR (DIN43864)

● RS485 communication port, Modbus Protocol

Large clear backlit display

 

Regular Price £119.99 Special Price £89.99
Availability: In stock
SKU
OB737CT
OB737-CT 3 Phase CT Electric Meter. MID Certified. is available to buy in increments of 1
Benefits and Main Features
•MID Certified Annex B & D
•Three phase metering7 DIN modules, Standard DIN rail Format (DIN43880)
•IEC62053-21/22 Class 1.0,0.5S
•Bi-directional active energy measuring,4-quadrant reactive measuring for latest 12 months
•Records MD and its occurent time for latest 12 months
•Instant Volt, Amp, Power factor, Frequency, Active power, Reactive power, Apparent power
•CT Operated metering, 100A Direct connected version is available
•Clock time verification function
•Isolate pulse output (DIN43864)
•LCD display, 6 integer 2 decimal, meter display when power fails
•Large clear backlight display
•Optional single-phase model
•RS485 communication port, modbus protocol
•IR port
•Program by button on the nameplate
•Memory back-up (EEprom)
 
 

Modbus Defaults

Modbus ID = 1

Parity = NONE   (Works with EVEN or NONE parity settings)

Baud Rate 9600

Supports HEX & Floating point registers

HEX = Function Code 3

Floating point = Function Code 4

 

OB737 BMS/ SCADA Modbus register-set OB737_BMS_SCADA_OPC_Register_Settings.pdf

Main Modbus registers

0010: L1 voltage

0012: L2 voltage

0014: L3 voltage

004E: Frequency

0050: L1 Current

0052: L2 Current

0054: L3 Current

0090: L1 power

0092: L2 power

0094: L3 power

0096: Total power

00D0: L1 apparent power

00D2: L2 apparent power

00D4: L3 apparent power

00D6: Total apparent power

0110:L1 Reactive power

0112: L2 Reactive power

0114: L3 Reactive power

0150: L1 power factor

0152: L2 power factor

0154: L3 power factor

 

 

More Information
ModelOB737_CT
ManufacturerOwen Brothers
In DepthElectricity meters for feed in tariffs (also known as FITs) are part of a Government backed scheme that pays people for generating their own "green electricity" (i.e. photovoltaic, wind, or hydro). The scheme is administered by Ofgem on behalf of the Department for Energy and Climate Change and further information is available from: http://www.ofgem.gov.uk/sustainability/environment/fits/Pages/fits.aspx To apply for the FIT scheme, installations must be in Great Britain and have a meter compliant with the metering legislation in place. This means that the electricity meter must be of an approved pattern or construction in accordance with Schedule 7 of the Electricity Act 1989. Prior to October 2006, only an approval issued under GB national legislation would satisfy this requirement and these meters are listed on the statutory list, known as Schedule 4. Visit the schedule 4 section of the NMO website. From 30th October 2006, “approved” may also refer to an electricity meter type approved by a notified body under the European Measuring Instruments Directive (MID 2004/22/EC). NMO is responsible for designating notified bodies in the UK for the majority of the instruments covered by the Directive and SGS (UK) Ltd have been designated as a Notified Body for the conformity assessment of active electrical energy meters under Annex MI-003. Download MID approval certificates issued by SGS (UK) Ltd on the NMO website. MID approved meters are also required to carry the MID markings as required under the Directive. These consist of the CE marking, the MID marking which is made up of the letter ‘M’ and then the year of manufacture (for example a meter manufactured in 2011 would have the following MID marking ) and a four-digit code representing the Notified Body that approved and verified the meter. - See more at: http://www.bis.gov.uk/nmo/gas-and-electricity-meters/electricity-meters-introduction/Electricity-meters-for-feed-and-tariffs#sthash.WrAsI3ar.dpuf
Length30
Height16
Bredth20
HS Tariff Code9030310000
Packing Buffer (in percentage)10
Packing TypeIndividual
Write Your Own Review
Only registered users can write reviews. Please Sign in or create an account
Trustpilot